Delivered across two school sites, the project involved the design, fabrication, and installation of over 800 linear metres of MDF boxwork in more than 50 locations, including classrooms, offices, cleaners’ cupboards, lobbies, receptions, staff rooms, and corridors. The works covered horizontal and vertical runs, with boxwork installed beneath radiators, across ceilings, and up the stairwell of a four-storey building. Each unit was precision-built for a consistent finish, with discreet access hatches incorporated to allow maintenance access. Depending on location, the boxwork was either spray-painted using a purpose-bought system for speed and uniformity or fitted with hygienic cladding in areas requiring enhanced cleanliness and durability. Huddersfield, West Yorkshire 10 weeks Education Installation This project, delivered across two school sites, focused on improving safety, hygiene, and appearance in areas containing exposed mechanical pipework. The goal was to provide a clean, robust, and low-maintenance solution that would: Scope of Works Our end-to-end service included: The completed works have significantly improved the visual quality and functionality of both school environments. The newly boxed pipework and hygienic wall finishes provide: This project successfully delivered practical, durable, and visually cohesive upgrades across both sites. Aligning with each schools operational, safety, and aesthetic requirements.
See Our Projects
Summer 2025 Boxwork Project
Location
Duration
Sector
Role
Client Objectives
Challenges
Solutions
Results
Gallery